Sign In | Join Free | My qualitytoyschina.com |
|
Brand Name : SDONG
Model Number : SB02-603
Certification : IAAF / ITF / ISO9001:2008/ ISO14001/ ISO18001/ SGS
Place of Origin : Guangzhou, China
MOQ : 500 sq.m
Price : Negotiable
Payment Terms : L/C, T/T, Moneygram, Paypal, Western Union
Supply Ability : 10000 sq.m per Month
Delivery Time : 10 days after your deposit
Packaging Details : Pack in barrel / carton/ fiber bag
Product Name : Red Self-forming Surface Mixed PU Running Track
Thickness : 13mm, or customized
Colour : Red/Blue/Green or customized
Service life : 6-10 years
Feature : Environmental-friendly, Durable
Standard : ISO9001:2008/ISO14001/ISO18001/SGS
Weather : All weather used
Suitable Scope : EDPM,SBR,PU Binder
Payment Term : Trade Assurance Advanced 30% T/T
Foundation : Cement or pitch
Delivery Times : 15days
Sample : Free for sample,freight self-pay
Red Self-forming Surface Mixed PU Athletic Sports Running Track
Product | Synthetic Running Track |
Thickness | 13 mm or customized |
Force Reduction | 41 |
Tensile Strength | 1.56 |
Elongation at break | 80 |
Modified Vert. Deform. | 1.9 mm @ 23°C [75°F] |
Friction | 0.64/48 |
Permeability | Impermeable |
Material | PU, SBR black granules, EPDM, etc |
Features | Environmental-friendly, UV-resistance, 5--10 years service time |
Market | North America, Southeast Asia, Western Europe, Domestic Market |
Application | Outdoor Rubber Track, Playground Sports Flooring, etc |
Test Item | Reference | Standard Data | Test Result |
Tensile | IAAF | ≥0.5 | 1.56 |
Elongation at Break | IAAF | ≥40 | 80 |
Force Reduction | IAAF | 35-50 | 41 |
Vertical Deformation | IAAF | 0.6-2.5 | 2.3 |
Skid Resistance | IAAF | ≥47 | 57 |
Hardness Shore A | GB/T 14833-2011 | 45-60° | 45-55° |
Fire Rating | GB/T 14833-2011 | I Degree | I Degree |
Color Stability | Good | ||
Chemical Resistance | Good |
Structure: 2mm thickness special thick liquid(Self-knot Pattern) top layer plus 11mm thickness PU glue mix SBR rubber particle on the Bottom
Advantage
1) Strong abrasion resistance
2) All weather resistance
3) Multifunctional
4) Anti - aging
5) Color optional
6) Wear - resistance
7) Super adhesive
Features
1. Self developed and patented products, more eco-friendly and lighter in weight.
2. Cost effective: consumption of materials will cut by 10%-15%.
3. Lower maintenance and excellent after-sales services.
4. Tested by authoritative organizations and quality guaranteed.
5. More stable and longer service life in all weather conditions.
6. One-stop service available: from project design to construction abroad.
7. Customer oriented operating philosophy.
8. Contributes to energy conservation, environment protection, sustainable development and pioneers in industry.
Packaging & Shipping
Sandwich System Running Track
MOQ | 500 Square Meter |
Supply Ability | 1000Tons/Per Month |
Delivery Times | 15days |
Payment Terms | T/T |
Port | Guangzhou |
Package Type:
1.Packing in barrel, SPU liquid material by 30kg /barrel
2.All of them are packed in small barrels, which is convenient for transportation and can be used immediately.
3.There is no need for specially skilled technicians to complete the paving of plastic runways.
Applications
Applicable to all types of schools at all levels and professional stadium, athletics track, semicircle area, auxiliary area, fitness paths, indoor stadium training track, playground surfacing roads, indoor and outdoor track.
Project case
FAQ:
Q1: Are you a factory or a trade company?
A1: We are an industry and trade company.Welcome to China factory inspection.
Q2: What is thickness for the IAAF Running Track?
A2: The International Standard thickness is 13mm. Other sizes are available as your request.
Q3: Can we get installation support if we have no own constructors?
A3: We can send salesmen and technical support to your country to assist the installation.
Q4: Are your running track materials safety?
A4: Yes, our materials are safe. Environmentally friendly and recyclable.
Q5: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them,
no matter where they come from.
Q6: What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q7:What is the Production time?
A:It is about 10-15days.
Q8:What are the options for the base construction of a running track.?
A:The ground is based on asphalt or concrete.
Q9:What is the life Span for Running track?
A:The life span is about 10-15years.
Q10:I am Interested in Synthetic track surface,what is the best choice?
A: We have 4 system:Spray coat,Sandwich,Full pour and Prefabricate system.
Spray coating:Price competitive , permeable and surface paint by machine, more suitable for school or practice project
Sandwich system: EPDM broad be handwork,is professional than spray coat, enjoying great popular in the world market.
Full pour System: Best quality, Bottom layer is PU with less sbr granules mix. Suitable for professional games and international school.
Prefabricated system: Is package by roll, Specification is 1.22*15m/20M, Strict request with base ground flat level. Professional for stadium international games. Like Olympic games.
![]() |
Multifunctional Mixed PU Sandwich System Running Track Good Color Fastness Images |